A reserve only protects customers if it can reach them before the shelf runs empty. This paper turns that timing problem into a design rule.

Stock upstream may arrive too late: where inventory sits can determine whether customers get served during a demand

A supply chain can have plenty of inventory and still run out at the checkout. What matters is not only how much stock exists, but where it sits—and how long it takes to move.

That is the central insight of Lorenzo Giordano and colleagues’ analysis of delayed serial supply chains. They ask a practical question: if demand suddenly exceeds a chain’s maximum production capacity, how can operators know how long they can keep serving customers? Their answer is a set of precise conditions linking survival time to the inventory distribution across factories, warehouses and the final distributor. The paper then turns those conditions into a cost-minimizing reserve plan and a controller that builds reserves in ordinary times and spends them during a shock (Giordano et al., 2026).

The result is not a universal promise that a given stockpile will withstand any crisis. It is a mathematical framework for a narrower, important task: given a serial chain, its transport delay, its release limits and a specified shock, determine whether a chosen inventory arrangement can keep demand served for a stated duration. In a world that has repeatedly discovered the hard way that “we have stock” is not the same as “we can deliver it,” that distinction matters.

Fig. 1: Schematic of a serial supply chain with N nodes, external input u, internal flows fi, transportation delays τ, and external outflow w.
Fig. 1: Schematic of a serial supply chain with N nodes, external input u, internal flows fi, transportation delays τ, and external outflow w. Source: Lorenzo Giordano, Francesco Lo Iudice

The Science

The paper models a chain of facilities connected one after another: a production source, intermediate storage or distribution nodes, and a final distributor. A single product moves downstream. Each intermediate node can release goods at a rate no greater than a constant times the inventory it holds. Goods also take time to travel between nodes. That delay, written as , means an upstream reserve cannot instantly help meet a surge at the customer-facing end.

The model tracks inventory at each node. Production enters the first node at a controlled rate, capped at a maximum. Internal flows move product to the next node, and customer demand leaves the final node. The key service condition is straightforward: demand is fully met only while the final node has stock. Once that inventory reaches zero, the chain has exited the “operational” state used in the analysis.

This is a deliberately simple geometry. Real supply networks contain branching routes, suppliers at multiple tiers, substitutions, and different products competing for capacity. A serial chain strips away that complexity to reveal a mechanism that can otherwise get lost: the timing of inventory movement changes how much protection the same total stock provides.

The authors distinguish ordinary demand from a demand shock. Ordinary demand does not exceed the maximum production rate. A shock does. If the shock lasts long enough, the total stock available in the chain must eventually be exhausted: production cannot replace goods as quickly as customers use them. The question is therefore not whether the chain can serve an indefinitely sustained shock, but how long it can continue before the final stockout.

They define this duration as an exit time. More precisely, it is the time from the shock’s start until the final inventory first reaches zero. The paper studies a constant shock with a specified size and duration, while the general model allows demand to vary in time. The analysis assumes demand is observable in real time and that flows can be controlled within the model’s constraints.

To derive the result, the researchers first study a particular shock-time policy: every intermediate node releases at its maximum allowed rate. This is a “push” policy, with release proportional to stock. The solution involves Erlang-shaped response functions—curves that describe how a signal spreads through a sequence of delayed, rate-limited stages. In plain language, a reserve at the first node does not arrive downstream as a sharp package; it is filtered and delayed as it passes through the chain.

That mathematical response lets the authors express final-node inventory as contributions from three sources: stock already at each node, goods that were already moving through the chain, and new production after the shock begins. Demand, by contrast, starts drawing down final inventory immediately. The distinction is consequential: production can be plentiful and still be too late to prevent an early stockout.

(a)
(a) Source: Lorenzo Giordano, Francesco Lo Iudice

What They Found

The core result is a necessary-and-sufficient test for surviving a prescribed shock horizon under the specified maximum-flow policy and constant pre-shock flow history. “Necessary and sufficient” means the conditions are not merely conservative rules of thumb within those assumptions: if the inequalities hold, demand remains served for the stated horizon; if they do not, the guarantee does not hold.

The test unfolds in stages. First, the final distributor needs enough inventory to cover demand’s excess over the pre-shock flow during the initial transport-delay window. Then the requirements move upstream: the paper gives conditions for each intermediate node, accounting for the time it takes its goods to arrive and for contributions from nodes farther downstream. After the full chain’s transport delay has elapsed, the condition also includes the effect of post-shock production reaching the final node.

This gives a more useful notion of resilience than total inventory alone. A pallet at the final distributor and a pallet at the production source are not equivalent when customers are drawing stock now and replenishment takes time. Nor are two inventories at different intermediate nodes interchangeable: their delivery timing and release dynamics differ. The distribution of stock becomes part of the safety margin.

The authors use these survival conditions to formulate an inventory-planning problem. They minimize a weighted sum of squared inventory levels, where the weights represent holding-cost differences across nodes. The constraints require enough stock to meet the survival conditions, include a safety margin, and ensure intermediate facilities have sufficient inventory to sustain the chosen release rate. Because the constraints are sampled at selected points in time, the resulting quadratic program is tractable, but its guarantee depends on how well that finite sampling captures the continuous-time conditions.

The paper then proposes a two-mode controller. During ordinary demand, it steers inventory positions toward the calculated target distribution. An inventory position includes not only stock physically at a node but also goods already in transit toward it. During a shock, the strategy uses available reserves to keep the final distributor supplied over the prescribed horizon. This separation is sensible: preparedness is built before the emergency, while the emergency policy focuses on drawing down stock and moving it through the chain.

A crucial point is that the paper does not report a single real-world “survival time” or a universal percentage improvement. The supplied paper content describes simulations but includes no numerical simulation results or parameter table. So the findings here are structural: the equations identify how delay, stock placement and production response determine survival, rather than demonstrating a measured increase in resilience for a named product or company.

The total amount in the chain includes inventory at facilities plus the material currently in transit. During a shock that remains above maximum production, this total declines because demand outpaces replenishment. That accounting establishes why survival must be finite if the shock persists indefinitely. But the exit-time result goes beyond this conservation argument: it determines whether the final node stays stocked for a chosen finite period, despite transport delays.

Why This Changes Things

Supply-chain planning often treats buffers as quantities: how many days of stock, how much warehouse capacity, or what fraction of demand can be covered. This paper adds a timing question. A buffer only protects service when it can reach the point where demand is being met before that point runs dry.

That perspective is especially relevant for products whose production and distribution are slow to scale. Medicines, critical components, food staples and emergency equipment may sit in multi-stage chains where upstream stock is plentiful but downstream availability is fragile. The model does not establish that any one sector should copy a particular reserve policy. It offers a way to frame the tradeoff: reserve placement can be optimized against an explicit shock size and duration, rather than chosen only through a blanket inventory target.

The concept is related to “time to survive,” a supply-chain risk measure describing how long operations can continue after a disruption. The control-theory contribution is to turn that broad concept into a calculable guarantee for a continuous-time chain with transport delays and constrained flows. The guarantee is conditional: it depends on knowing or bounding key parameters, on the chain being serial, on the chosen flow policy, and on the demand-shock assumptions.

This conditional character is a strength as well as a limitation. Managers cannot control how long a crisis lasts, and demand rarely follows a neat constant step. Yet a stated scenario—say, a demand increase of a specified size lasting a specified time—can still guide procurement and storage decisions. It makes assumptions visible, allowing planners to ask whether the chosen reserve is meant to protect against a short spike, a prolonged disruption, or a particular bottleneck.

There is also a clear cost-resilience tension. More inventory can improve survival, but it ties up capital, occupies space and may expire or become obsolete. The quadratic objective gives the planner a formal way to trade holding cost against service assurance, with node-specific cost weights. It does not resolve every practical issue—such as spoilage, uncertain lead times, or competing uses—but it makes the reserve allocation itself an optimization problem rather than a guess.

The most important conceptual shift may be from “How much stock do we have?” to “How much stock can arrive in time?” A supply chain is not a static warehouse. It is a flow system, and the goods in motion, the release rates and the delay between stages all shape its ability to absorb a shock.

What’s Next

The paper’s practical promise will depend on extending the model toward the networks and uncertainties companies actually face. A serial chain is a useful starting point, but many supply networks branch, merge and share capacity. Extending the analysis to those structures could reveal whether reserves should be concentrated at common bottlenecks, distributed across alternative routes, or held near customers.

Demand is another open challenge. The main guarantee treats a constant shock, while real surges rise, fall and sometimes trigger further changes in ordering. A robust extension could test a family of demand paths and uncertain transport delays, then produce reserve targets that survive the worst credible case. Such guarantees would likely be more conservative, but they could better match emergency planning.

The optimization also approximates continuous-time constraints using finite samples. More sample points or constraint-generation methods can refine the approximation, as the paper notes. A next step is to quantify how much protection is lost, if any, between sampled instants and to provide computationally efficient certificates that the whole interval remains safe.

Finally, the proposed controller is illustrated in simulation, not validated in a live supply chain. Real implementation would need reliable inventory and in-transit data, workable flow controls, and decisions about how to respond when the demand shock is detected late or when suppliers fail at the same time. Those are not small details: they determine whether a mathematical reserve can become an operational one.

Still, the framework gives resilience planning a more precise object to manage. It treats survival time as something that can be designed for, not merely observed after a crisis. By connecting a shock’s duration to where stock sits and how quickly it can travel, the work opens a path toward reserves that are smaller where possible, better placed where needed, and tied to an explicit promise about how long service can hold.