A small price add-on could end power-market make-whole payments

A uniform price adder can remove generator make-whole payments without erasing the price signals that reveal where the grid is constrained.

$43.4k/day more: consumer payments under LMP+U in the paper’s congested simulation.

An electricity market can order a power plant to generate, then pay it a price below the plant’s submitted offer. The operator may later cover the shortfall with a make-whole payment: compensation outside the market’s published price. In simulations of a constrained power grid, a proposed alternative eliminated those energy make-whole payments—but raised total consumer payments by $43.4,000 per day compared with the conventional settlement in the congested case. The trade-off sits at the heart of a new design for electricity pricing: make compensation visible in the price itself, without flattening the signals that tell the system where power is scarce.

The proposal, called LMP+U, adds one common amount to the locational marginal prices (LMPs) at every bus. An LMP is the market’s price of supplying one more unit of electricity at a particular point on the grid. Its differences from place to place reflect congestion: if a line is full, electricity on one side can be more valuable than electricity on the other. The “U” is a uniform adder, a shared adjustment that raises or lowers all those local prices by the same amount.

Valentina Norambuena-Guzman, Cong Chen, Lang Tong and Timothy D. Mount show how to choose that adder so that every dispatched generator’s energy revenue covers its submitted energy offer, while the price gaps between locations remain intact. The design addresses a real tension in market operations. The conventional practice protects generators from being paid less than their offers, but does so through separate payments that can be hard to see in the headline market price. LMP+U makes that compensation part of the price instead. It does not, however, promise lower bills or higher profits for every generator. In the study’s simulations, consumers paid more under the new settlement, and revenue effects varied across generator groups.

The Science

Electricity has to be balanced continuously: generation and demand must match, while power flows stay within the capacity of transmission lines. Grid operators therefore solve dispatch problems that choose which generators run, how much they produce, and which reserves to hold ready. In markets with flexible ramping products (FRP), some generating capacity is reserved so output can rise or fall quickly as demand and renewable generation change.

The paper focuses on a complication of rolling dispatch. Operators repeatedly optimize across a look-ahead window, but implement and settle only the current interval; future schedules are advisory and may change. A generator may need to produce now to satisfy a ramping or reserve constraint even if the current LMP falls below its submitted energy offer. The operator then owes an energy make-whole payment, or MWP, to bridge the gap. FRP payments are separate and remain so in the proposal.

The authors formulate the dispatch and pricing problem for a transmission-constrained network. After the operator fixes the dispatch, reserve awards and LMPs, LMP+U chooses prices that minimize the energy payments collected from demand, subject to two requirements: every dispatched generator’s price must cover its submitted offer, and all differences between nodal prices must match the LMP differences. The result has a compact rule: find the largest gap between a dispatched generator’s offer and its local LMP, then add that gap to every nodal LMP. If every dispatched generator’s LMP already exceeds its offer, the adder can be negative.

The authors test the design in the IEEE RTS-24 system, a standard 24-bus test network with 12 generators. They simulate four-interval rolling dispatch over 15-minute intervals across a day, using 100 net-demand trajectories. They compare reference transmission limits with a congested case, created by tightening two line limits, and examine cases with and without FRP as well as changes in ramping capability. The figures show group-level results and uncertainty across simulated trajectories—not predictions of actual market bills.

Fig. 1: IEEE RTS-24 network, marginal production costs, and generator groups. Green, orange, and red indicate low-, medium-, and high-cost generators; dashed red lines indicate the lines with reduced limits in the congested case.
Fig. 1: IEEE RTS-24 network, marginal production costs, and generator groups. Green, orange, and red indicate low-, medium-, and high-cost generators; dashed red lines indicate the lines with reduced limits in the congested case. Source: Valentina Norambuena-Guzman, Cong Chen

What They Found

The central mathematical result is that this uniform adder is the least-cost way to cover all dispatched energy offers while preserving LMP-based congestion differences. “Least-cost” here means minimizing energy payments by demand among uniform pricing schemes satisfying those constraints; it does not mean that every consumer pays less than under the existing LMP-plus-MWP system. Nor does the result say total payments, including reserve costs, always fall.

The adder preserves the difference between any two locations’ energy prices. That matters because the price spread remains a measure of transmission constraints and can continue to support financial transmission rights, contracts used to hedge congestion costs. The authors also show that the adder leaves energy merchandising surplus unchanged. This surplus is the difference between energy payments collected from demand and energy payments made to generators; it can help fund settlement obligations.

In the simulations with FRP and original ramping limits, LMP+U increased total consumer payments by $35.7,000 per day in the reference transmission case and $43.4,000 per day in the congested case, compared with LMP plus make-whole payments. The comparison is a reminder that replacing individual uplift payments with a market-wide price adjustment changes who pays and when. It does not erase the underlying costs of dispatching the system.

Consumer payment premium under LMP+U

Reported mean daily excess total consumer payments under LMP+U relative to LMP+MWP in the two cases with FRP and original ramping limits.

Consumer payment premium under LMP+U
LabelValue
Reference transmission35.7 $k/day
Congested transmission43.4 $k/day

Who receives revenue also depends on operating conditions. With FRP and reference transmission limits, congestion reduced the low-cost group’s mean daily net revenue from $330.6,000 to $113.8,000 under LMP+U. Under conventional LMP+MWP, it fell from $309.9,000 to $91,000. The generator group still received energy bid-cost recovery, but that did not protect its net revenue from the effects of congestion and the associated dispatch. In the congested simulations, generator G5 uniquely set every negative adder, reducing energy payments while maintaining offer-cost recovery.

FRP procurement changed outcomes in ways that were not uniform across technologies or cost groups. With original ramping capability and reference transmission limits, adding FRP increased the share of intervals with a positive adder from 30.82% to 33.34%. It also increased how often at least one dispatched generator’s LMP fell below its offer. Relative to the no-FRP case, the low- and medium-cost groups’ mean daily net revenues fell under both settlement designs, while the high-cost group’s revenue rose. Those results show why a single overall average can hide differences between generators.

More ramping capability did not automatically mean more net revenue for the group that supplied it. When the medium-cost group gained 150 megawatts of ramping capability per interval in each direction, its mean daily net revenue fell by $8,800 under LMP+U and by $1,420 under LMP+MWP. More capability can help the system meet changing needs, but it can also affect dispatch, reserve payments and the common adder. The study’s group-level results suggest possible incentives to withhold ramping capability, but do not establish that an individual generator could profit by doing so.

Fig. 3: Mean daily net-revenue changes from separately increasing each group’s ramping capability, with FRP and reference transmission limits. Error bars show 95% confidence intervals for mean changes across 100 paired trajectories.
Fig. 3: Mean daily net-revenue changes from separately increasing each group’s ramping capability, with FRP and reference transmission limits. Error bars show 95% confidence intervals for mean changes across 100 paired trajectories. Source: Valentina Norambuena-Guzman, Cong Chen

The paper’s other major finding concerns bidding incentives. Under conventional LMP+MWP, if a generator is receiving a positive make-whole payment, increasing its offer can raise its compensated energy revenue, as long as the market’s dispatch solution stays in the same local regime. Under LMP+U, the same offer change does not necessarily translate into a higher price for that generator: the common adder may be set by another plant, while the relevant local price moves with the difference between the two plants’ LMP responses.

A worked example makes the mechanism concrete. In one simulated interval, G4 at bus 13 generated 352.09 megawatts at a true marginal cost of $20.93 per megawatt-hour, while its LMP was $10.52. Another plant, G5, set the adder, giving G4 an LMP+U price of $26.11 per megawatt-hour. As G4’s offer rose by less than $5.18 per megawatt-hour, the same dispatch basis and adder setter remained in place. Each $1 per megawatt-hour offer increase raised G4’s net revenue by $88.02 over the 15-minute interval under LMP+MWP; under LMP+U its net revenue stayed constant.

Offer inflation: revenue response in one dispatch interval

For generator G4, each $1/MWh increase in its offer raised net revenue under LMP+MWP by the reported amount; under LMP+U, revenue remained constant over the specified local range.

Offer inflation: revenue response in one dispatch interval
LabelValue
LMP+MWP88.02 $ per $1/MWh offer increase
LMP+U0 $ per $1/MWh offer increase

That result is local, not a guarantee against strategic bidding. It applies while the same optimization basis and a unique adder setter remain in place. The authors explicitly note that price-taking generators may still profit from larger deviations under either pricing system. The more limited claim is that LMP+U removes a particular short-run reward for offer inflation in the conditions they analyze.

Why This Changes Things

Make-whole payments solve a practical problem: a generator instructed to run should not be left with an energy-market payment below its submitted offer cost. But when the compensation is outside the market price, two generators following dispatch instructions can receive different effective prices even if the public LMP does not show that distinction. Resource-specific payments may also weaken incentives to offer close to marginal cost. Regulators and market operators have long sought prices that reflect both the cost of serving demand and the physical constraints of the grid.

LMP+U reframes the issue as a pricing rule rather than a separate reimbursement. It treats the largest dispatched offer-price shortfall as the amount the entire system needs to add to its local prices. Because the same amount applies everywhere, it can provide energy bid-cost recovery without discarding the geographic information in LMPs. In a network without congestion, the rule reduces to a simpler maximum-dispatch-cost price: all energy prices match the highest offer among dispatched generators. If ramping constraints do not create an energy shortfall, the adder is zero and the design is just ordinary LMP.

The costs are real. In the paper’s tested cases, total consumer payments under LMP+U exceeded LMP+MWP. That finding complicates any claim that more transparent settlement is automatically cheaper. The study’s pricing objective minimizes demand energy payments among a particular class of uniform prices, while the reported consumer total also includes FRP payments and make-whole payments under the benchmark. The comparison depends on the system conditions and the exact settlement components being counted.

The design also does not insulate generators from congestion. The low-cost group’s revenue dropped sharply when the model tightened transmission lines, under both pricing approaches. That is not a failure of bid-cost recovery: the guarantee covers submitted energy offers for dispatched output, not a generator’s previous level of earnings. The distinction matters for debates about market design. A price rule can improve settlement consistency without guaranteeing stable revenues or eliminating the consequences of an increasingly constrained grid.

Fig. 2: Mean daily group net revenue with FRP and original ramping limits in (a) the reference and (b) congested cases. Patterned portions represent MWPs. Error bars show 95% confidence intervals for means across 100 trajectories.
Fig. 2: Mean daily group net revenue with FRP and original ramping limits in (a) the reference and (b) congested cases. Patterned portions represent MWPs. Error bars show 95% confidence intervals for means across 100 trajectories. Source: Valentina Norambuena-Guzman, Cong Chen

What’s Next

The paper establishes properties of a pricing rule and tests them in a standard network model; it does not show how the rule would perform across a full real-world market with actual bids, settlements, operator procedures and strategic responses. Its simulated demand traces are based on an autoregressive model fitted to historical California net demand, and the network is a test system. Market operators would need to assess how results change with real generator portfolios, reserve requirements, offer caps, uncertainty and the way uplift and reserve costs are allocated.

There are also design questions beyond energy make-whole payments. FRP payments remain separate in this proposal, and the analysis does not claim to remove every form of out-of-market compensation. A wider implementation would need to specify how the uniform adder interacts with other settlements, how it is communicated to participants, and how consumers bear the additional payments seen in these simulations. Researchers would also need to test whether the local bidding incentives persist when many generators anticipate and respond to the new rule.

Still, the paper offers a useful way to make a hidden trade-off visible. The grid may need a plant to run even when the energy price implied by dispatch does not cover its offer. A market can compensate that plant through a private-looking adjustment after the fact, or put a common adjustment into the energy price itself. LMP+U shows how to do the latter without erasing congestion signals. The next question is not whether a cleaner price rule has consequences—it does—but whether its transparency and bidding incentives justify those consequences, and how operators might refine the design before bringing it to real markets.