How to Pay for the Grid of the Future: A Mathematical Key to Unlocking Private Investment in Clean Energy

How to Pay for the Grid of the Future: A Mathematical Key to Unlocking Private Investment in Clean Energy
38% % Savings share for investors
MTDC Networks Technology used
MISOCP Model type
Fair Cost Sharing Goal

The average cost of building a high-voltage transmission line in the U.S. exceeds $3 million per mile. Yet across Europe and North America, aging power grids are buckling under rising electricity demand, renewable integration, and climate-driven stress. One promising fix? Multi-terminal high-voltage direct current (MTDC) networks—advanced electrical highways that can reroute power with precision, relieve congestion, and unlock clean energy. But here’s the catch: no one wants to pay for them.

Enter a new study (Li et al., 2026) that cracks open a critical bottleneck: how to design financial incentives so private investors will build these systems, while still leaving enough value for the public grid operator. The researchers found that a carefully tuned benefit-sharing rate—where the transmission system operator (TSO) gives up just 38% of the system’s operating-cost savings—can make merchant investment not only viable but optimal. At that rate, investors recover their costs and earn a fair return, while the TSO retains 62% of the benefits. This balance, derived from a novel mathematical model, could become the blueprint for financing the next generation of grid infrastructure.

The Science

The paper, led by Haixiao Li of Delft University of Technology with collaborators from the University of Ljubljana, tackles a real-world paradox. Technically, MTDC networks are a no-brainer. Using voltage source converters (VSCs), they can connect multiple points on an alternating current (AC) grid via a direct current (DC) backbone, enabling flexible power flow control. They’re especially useful for integrating offshore wind, managing cross-border electricity trade, or relieving bottlenecks in dense urban areas.

But unlike traditional grid expansions funded by regulated utilities, MTDC projects are often expected to be built by merchant investors—private firms seeking profit. These investors won’t act unless they can earn a return. Meanwhile, the TSO, which manages the overall grid, benefits from reduced congestion and lower generation costs but doesn’t want to overpay.

The core challenge is alignment: how to ensure that the VSCs are sited and sized to maximize system value and be financially attractive to investors. Previous models optimized technical performance but ignored investor economics. This paper bridges that gap with a parametric mixed-integer second-order cone programming (MISOCP) model—a sophisticated optimization framework that jointly decides where to place VSCs, how large they should be, and how much of the resulting savings should be shared with the investor.

The model incorporates:

  • AC and DC power flow physics, relaxed into convex form for computational tractability
  • Binary variables to represent siting decisions (e.g., connect VSC A to bus 5 or bus 7)
  • Continuous variables for power flows, voltages, and converter sizes
  • A parametric benefit-sharing rate, denoted , that determines what fraction of the TSO’s cost savings is transferred to the investor as revenue

The researchers tested their model on a customized 12-bus AC/DC hybrid system (

Figure 2: Customized AC/DC hybrid system. Each AC bus is considered a candidate connection point for the VSCs, whereas the MTDC network topology and the associations between the DC terminals and the VSCs are fixed.
Figure 2: Customized AC/DC hybrid system. Each AC bus is considered a candidate connection point for the VSCs, whereas the MTDC network topology and the associations between the DC terminals and the VSCs are fixed. Source: Haixiao Li, Jure Lokar

), where three VSCs link to a four-terminal MTDC network. The AC grid includes generators, loads, and transmission lines, with each AC bus considered a candidate connection point. The MTDC topology is fixed, but the VSC locations and ratings are optimized.

Figure 2: Customized AC/DC hybrid system. Each AC bus is considered a candidate connection point for the VSCs, whereas the MTDC network topology and the associations between the DC terminals and the VSCs are fixed.
Figure 2: Customized AC/DC hybrid system. Each AC bus is considered a candidate connection point for the VSCs, whereas the MTDC network topology and the associations between the DC terminals and the VSCs are fixed. Source: Haixiao Li, Jure Lokar

Figure 2 from the paper: Customized AC/DC hybrid system. Each AC bus is a candidate connection point for the VSCs, while the MTDC network topology and VSC–DC node associations are fixed.

What They Found

The case study revealed that integrating the MTDC network reduced annual generation costs by €1.24 million compared to the base AC-only system. This saving comes from more efficient dispatch—shifting generation from expensive, carbon-intensive plants to cheaper, cleaner sources by rerouting power around congested lines.

But the key insight lies in the incentive design. The researchers simulated how the investor’s net present value (NPV) changes as the benefit-sharing rate increases. Below a threshold, the project isn’t worth building. Above it, the investor profits, but the TSO gives away too much value.

They identified the minimum viable that makes the investment NPV-positive: 38%. At this rate:

  • The investor recovers the €4.8 million capital cost over the project lifetime
  • The investor earns a return consistent with typical infrastructure risk premiums
  • The TSO retains €770,000 of annual savings—still a massive win

This 38% rate isn’t arbitrary. It emerges from the interplay of converter sizing and siting. When is too low, the model responds by building smaller, cheaper VSCs to minimize investor risk—even if that limits system benefits. When is higher, larger converters are justified, unlocking more savings. But beyond 38%, the TSO gets diminishing returns.

The model also revealed that optimal VSC placement depends on the incentive structure. At low , converters are sited at locations with minimal investment cost, not maximum system impact. At the 38% threshold, the siting aligns with high-congestion nodes, maximizing overall efficiency.

To visualize this, the authors generated a trade-off curve between investor return and TSO savings (

Investor NPV vs. Benefit-Sharing Rate

As the sharing rate increases, the investor's net present value rises from negative to positive, crossing zero at 38%. TSO savings decline linearly.

Investor NPV vs. Benefit-Sharing Rate
LabelValue
0%-2.1
10%-1.6
20%-0.9
30%-0.3
38%0
50%0.8
70%1.9
100%4.2

). It shows a clear inflection point: below 38%, the investor walks away; above it, both parties gain, but the TSO’s marginal benefit declines.

Investor NPV vs. Benefit-Sharing Rate

As the sharing rate increases, the investor's net present value rises from negative to positive, crossing zero at 38%. TSO savings decline linearly.

Investor NPV vs. Benefit-Sharing Rate
LabelValue
0%-2.1
10%-1.6
20%-0.9
30%-0.3
38%0
50%0.8
70%1.9
100%4.2

Benefit-sharing trade-off: As the sharing rate increases, investor NPV rises while TSO savings decrease. The optimal rate (38%) balances viability and efficiency.

They also compared different VSC sizing strategies (

Annual Generation Cost Savings by Strategy

Comparison of different VSC planning approaches: cost-minimizing, system-optimal, and the proposed benefit-sharing model.

Annual Generation Cost Savings by Strategy
LabelValue
No MTDC0 €k
Cost-Minimizing320 €k
Proposed Model770 €k
System-Optimal800 €k

). A cost-minimizing approach (ignoring system benefits) leads to undersized converters and minimal savings. A system-optimal approach (ignoring investor returns) maximizes savings but is financially unviable. The proposed model finds the sweet spot: near-optimal savings with guaranteed investment.

Annual Generation Cost Savings by Strategy

Comparison of different VSC planning approaches: cost-minimizing, system-optimal, and the proposed benefit-sharing model.

Annual Generation Cost Savings by Strategy
LabelValue
No MTDC0 €k
Cost-Minimizing320 €k
Proposed Model770 €k
System-Optimal800 €k

Comparison of VSC sizing strategies: The proposed parametric MISOCP model achieves 96% of maximum possible savings while ensuring investor viability.

Why This Changes Things

This work matters because it transforms a political and financial stalemate into a solvable engineering problem. For years, grid planners have faced a catch-22: we need more flexible transmission to integrate renewables, but no one will build it without guaranteed returns, and regulators won’t approve excessive payments.

The 38% rule—while specific to this case—points to a broader principle: there exists a mathematically definable, Pareto-efficient point where public and private interests align. That’s powerful. It means regulators don’t have to guess or negotiate in the dark. They can use models like this to set incentive rates that are transparent, defensible, and economically efficient.

Consider Europe’s North Sea Wind Power Hub, a proposed multinational MTDC network to connect 70 GW of offshore wind. Who pays? How are benefits shared? Without a framework like this, such projects stall in interminable negotiations. With it, policymakers can simulate different sharing rates, assess trade-offs, and design contracts that attract capital while protecting consumers.

The same logic applies to the U.S., where FERC Order 1920 is pushing for more regional transmission planning. If merchant investors are to play a role, they need predictable revenue streams. This model offers a way to calibrate those streams to actual system value—not arbitrary tariffs or political favors.

Moreover, the use of MISOCP is itself significant. Power system optimization has long been plagued by non-convexities that make problems hard to solve. By reformulating the AC/DC power flow equations into second-order cone constraints, the authors make the problem computationally tractable without sacrificing much accuracy. This opens the door to applying similar models at larger scales—state, national, or even continental grids.

It also reframes the role of the TSO. Instead of being a passive beneficiary, the TSO becomes an active market designer, setting the incentive parameter like a central banker sets interest rates—to balance investment and efficiency.

What’s Next

The model is a breakthrough, but it’s not the final word. Several limitations point to future research.

First, it assumes perfect information: the TSO knows the investor’s cost of capital, risk tolerance, and return expectations. In reality, these are private and potentially strategic. Future work could incorporate game-theoretic models where investors bid for projects, or where the TSO uses auctions to discover the lowest viable incentive.

Second, the analysis is static—based on representative scenarios. A dynamic version could account for evolving renewable penetration, demand growth, or carbon prices, adjusting over time.

Third, the model focuses on operating-cost savings, but MTDC networks provide other benefits: improved reliability, reduced curtailment, lower emissions. Monetizing these could further improve the business case and allow for lower rates.

Finally, real-world contracts are more complex than a single sharing parameter. They include capacity payments, availability penalties, and performance incentives. The next step is to map the abstract onto real regulatory mechanisms—like FERC’s incentive-based rates or the EU’s Guidelines on Electricity Transmission Network Investment.

Still, the core insight stands: we can engineer not just the grid, but the economics that make it possible. That’s a shift from seeing infrastructure as a political football to treating it as a design problem—one where math can help us build a cleaner, more resilient energy future, one converter at a time.

As Li and colleagues write: "The proposed model enables the TSO to proactively shape investment decisions through incentive design, rather than merely reacting to them." In a world where climate action hinges on moving electrons at scale, that’s not just good engineering. It’s essential.